Fig. 6: Drilling dimensions [mm]
u Remove the perforated drilling template from
the board.
u Using the drilling template, align the holes hori-
zontally, mark and drill (Ø 8 mm).
u Prepare the required cable entry point.
1 "5.5.2 Prepare the cable entry point" [} 15]
u Install the product.
1 "5.5.3 Installing the product" [} 15]
5.5.2 Prepare the cable entry point
The following cable entry options are available:
n Top (2 x M20, 1 x M32)
n Bottom (2 x M16, 2 x M20, 1 x M32)
n Reverse side (2 x M16, 2 x M20, 1 x M32)
u Using a suitable tool, break out the required
cable entry point at the predetermined location.
u Insert the compatible membrane gland (in-
cluded in delivery) into the respective cable
entry point.
110
110
Cable
Dia-
Matching membrane gland
entry
meter
point
Top and
M16 or
Membrane gland with strain
bottom
M20
relief.
Sealing ranges:
n M16: 4.5 - 10 mm
n M20: 6 - 13 mm
Top and
M32
Cable gland and locknut
bottom
n Cable gland tightening
n Locknut tightening
n Sealing range: 13 - 21 mm
Reverse
M16,
Membrane gland without
side
M20 or
strain relief.
M32
Sealing ranges:
n M16: 1 - 9 mm
n M20: 1 - 15 mm
n M32: 1 - 25 mm
5.5.3 Installing the product
The fastening materials provided (screws
and dowels) are only suitable for installation
on concrete, brick or wooden walls.
u Select suitable fastening material.
u Screw the two upper screws into the wall up to
10mm.
u Hang the product on the screws.
u Fasten the product to the wall with the two
lower screws. Select the tightening torque ac-
cording to the building material of the wall.
u Tighten the two upper screws. Select the tight-
ening torque according to the building material
of the wall.
u Check the product for horizontal and secure at-
tachment.
u Insert the supply line into the product through
the respective cable entry point together with
the control / data line (if applicable).
torque: 7 Nm
torque: 7.5 Nm
EN
15