Item
Connection
8
Sleeve
9
Socket (closed)
10
Sleeve
11
Sleeve
12
Drillhole
13
Sleeve (closed)
14
Sleeve (closed)
15
Socket (open)
16
Sleeve (covered)
Drillhole
17
(concealed)
Drillhole
18
(concealed)
19
Sleeve
20
Sleeve
Drillhole
21
(concealed)
22
Sleeve
23
Sleeve
24
Sleeve (closed)
25
Drillhole
1.2 Characteristics of the individual segments
Individual
Figure
segments
Middle part low
Middle section high
Dimension
Use
–
Attachment of high-pressure spraying head, right
OD 110 mm
Connection of on-site ventilation duct on the right
–
Attachment of filling unit, right
–
Attachment of high-pressure spraying head, right (optional)
–
Attachment of inspection window, right
G ¾ "
Right grease film thickness gauge connection (optional)
G ¾ "
Left grease film thickness gauge connection (optional)
OD 200 mm
On-site drain line connection
–
Attachment of high-pressure spraying head, left (optional)
–
Attachment of inspection window, left
–
Attachment of pitot tube, left
–
Attachment of heating rod
–
Attachment of heating rod
–
Attachment of pitot tube, right
–
Attachment of heating rod
–
Attachment of heating rod
G 2 "
Bottom outlet
–
Attachment of suction unit or suction with disposal pump
Ø D
[mm]
Top part
1,890
1,890
1.890
Bottom part
1,890
Base
1,890
LipuJet - P -RB / - RD / - RM / - RA / - RAP
Connections and characteristics
Height
[mm]
785
425
815
815
360
Weight [kg]
75
40
65
75
90
61/ 454