Pull the sealing ring [ 6 ]
of the middle section [ 5 ] and
spigot
fix it to the bead
with adhesive
Insert the middle section [ 5 ] into the
bottom section [ 7 ] . Place the holes
over the stud bolts [ 11 ] .
Connect the screw joints
[ 11 ] , washer [ 3 ] and nut [ 2 ] ).
IMPORTANT
Repeat the steps for the additional middle
section of nominal size 22.5.
Pull the sealing ring [ 4 ]
of the upper section [ 1 ] (5)
spigot
and fix it to the bead
.
LipuJet - P -RB / - RD / - RM / - RA / - RAP
over the
.
(stud bolt
over the
with adhesive
Installation
65/ 454