Putting Into Operation - Abicor Binzel FES-200 Instructivo De Servicio

Ocultar thumbs Ver también para FES-200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FES-200

6 Putting into operation

Risk of injury due to unexpected start-up
For the entire duration of maintenance, servicing, mounting, dismounting and repair work, the following
instructions must be adhered to:
• Switch off the power source.
• Pull the mains plug.
Hazard due to overheating
Increased wear to the electric motor due to overheating.
• A cool-down period of at least 5 minutes must be observed for every 30 minutes of operating time.
• This value may change depending on the ambient temperature of max. 25°C.
4
FES-200
1
Fume extraction system
2
Extraction hose (cable assembly)
Fig. 4
Putting into operation
1 Connect the torch system (4), hose and rubber connector to the fume extraction system.
NOTICE
• When fastening the start-stop replace pliers (3) with clamp, make sure that the red dot points in the
2 Connect the start-stop pliers (3) to the fume extraction system (1) and fasten it to the extraction hose (2)
(cable assembly) of the torch system (4). (Option)
3 Connect the dedusting system to the compressed air.
4 Plug in mains plug.
DANGER
WARNING
3
Start-stop pliers, 4 pole (deviating figure possible)
direction of the torch system.
6 Putting into operation
1
2
3
4
Torch system
EN - 15

Publicidad

Tabla de contenido
loading

Tabla de contenido