Operating Elements; Putting Out Of Operation; Maintenance And Cleaning - Abicor Binzel FES-200 Instructivo De Servicio

Ocultar thumbs Ver también para FES-200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8 Putting out of operation

7.1 Operating elements

1
5
1
Manometer
2
Rocker switch
Fig. 6
Operating elements
8 Putting out of operation
 Fig. 6 Operating elements on page EN-18
1 Set the rocker switch (2) on the fume extraction system to the 0 position.
2 Disconnect the system from the mains by unplugging the mains plug from the socket.
NOTICE
• If the voltage circuit breaker (4) triggers, press it back in again.

9 Maintenance and cleaning

Scheduled maintenance and cleaning is a prerequisite for a long life and a trouble-free operation.
Risk of injury due to unexpected start-up.
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Close off the compressed air supply.
• Pull the mains plug.
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
EN - 18
3
Connection of mains connecting cable with plug
4
Voltage circuit breaker
DANGER
WARNING
2
4
3
5
Star-stop pliers connection (7/4-pole)
FES-200

Publicidad

Tabla de contenido
loading

Tabla de contenido