Tabla De Contenido; Statement Of Conformity - baltur TBL 85P Manual De Instrucciones De Uso

Quemadores de gas de dos etapas
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

-
Before using the burner for the first time please carefully read the chapter "WARNINGS NOTES FOR THE USER : HOW TO USE
THE BURNER SAFELY" in this instruction manual, which is an integral and essential part of the product. The works on the burner
and on the esystem have to be carried out only by competent people.
-
Read carefully the instructions before starting the burner and service it.
-
The system electric feeding must be disconnected before starting working on it.
-
If the works are not carried out correctly it is possible to cause dangerous accidents.
DVGW CERT GmbH, Josef-Wirmer Strasse 1-3 - 53123 Bonn (D)
We hereby declare under our own responsibility, that our domestic and industrial
blown air burners fired by gas, oil and dual fuel series:
BPM...; BGN...; BT...; BTG...; BTL...; TBML...; Comist...; GI...; GI...Mist;
Minicomist...; PYR...; RiNOx...; Spark...; Sparkgas...; TBG...;TBL...; TS...;
IBR...; IB...
(Variant: ... LX, with low NOx emissions)
respect the minimal regulation of the European Directives:
• 2009/142/EC
• 2004/108/EC
• 2006/95/EC
• 2006/42/EC
and have been designed and tested in accordance with the European Standards:
• EN 676 (gas and dual fuel, gas side)
• EN 267 (light oil and dual fuel, oil side)
Cento, 23 July 2013
!
IMPORTANT / NOTE
TECHNICAL DATA ........................................................................................................................................................................................................... 6
FUEL PIPE ....................................................................................................................................................................................................................... 8
APPLICATION OF BURNER TO BOILER ........................................................................................................................................................................ 12
ELECTRICAL CONNECTIONS ........................................................................................................................................................................................ 13
DESCRIPTION OF WORKING ........................................................................................................................................................................................ 14
FIRST FILLING UP OF PIPELINES ................................................................................................................................................................................. 15
STARTING UP AND REGULATION ................................................................................................................................................................................ 15
CHECKS ........................................................................................................................................................................................................................... 16
JACK ADJUSTMENT INSTRUCTIONS ........................................................................................................................................................................... 17
MAINTENANCE ............................................................................................................................................................................................................... 20
HOW TO FIND THE CAUSES OF IMPROPER WORKING AND HOW TO RECTIFY THEM ......................................................................................... 21
DETAILS OF SUNTEC PUMP ......................................................................................................................................................................................... 23
CAMS REGULATION SERVOMOTOR SQN 72.2B4A20 ................................................................................................................................................. 24
ELECTRIC DIAGRAM ...................................................................................................................................................................................................... 26

Statement of Conformity

CE0085:
(G.A.D)
(E.M.C.)
(L.V.D)
(M.D.)
R&D Manager
Eng. Paolo Bolognin
i
INFORMATION
0006081325_201409
CEO and General Manager
Dr. Riccardo Fava
I
1 / 30
WARNING / ATTENTION

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbl 85p dacaTbl 105pTbl 105p dacaTbl 130pTbl 130p dacaTbl 160p ... Mostrar todo

Tabla de contenido