Orved evox 25 Manual De Uso página 41

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7) Proceed to the preliminary clearing of vacuum chamber and lid. See chap.5.1
8) Final checks.
Carry out the following checks before switching the machine on:
• Check the correct electric connection.
• Check the pump oil.
When these checks have been completed:
• In order to calibrate the vacuum sensor to the atmospheric pressure level, at the first use and any time the machine
is moved from a place to another at a different altitude, it's necessary to operate the vacuum sensor calibration.
Connect the machine, then press the PUMP key for 5 seconds and close the lid. Wait until the end of the cycle.
• Check the absorption using an ammeter.
• Carry out at least one complete vacuum packing functioning cycle for bags.
• Inform the customer regarding the exact use of the machine with specific reference to use and the requirements of
the customer himself.
Rev. 02 - 05/2016 - Cod. 1500015 - Instruction manual for vacuum chamber packaging machines EVOX 25 / EVOX 25 H
INSTALLATION
41

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Evox 25 h

Tabla de contenido