Voltage Supply "10 V Dc; Relay Output "K1" For Fault Indication; Modbus (Rs-485) Interface; Potential At Control Voltage Connections - Siemens SIMOTICS M-1PH818 Instrucciones De Servicio

Motor síncrono
Ocultar thumbs Ver también para SIMOTICS M-1PH818:
Tabla de contenido

Publicidad

Assembly instructions ECblue
5.8

Voltage supply "10 V DC"

Voltage supply for external components, e.g. for a potentiometer for speed setting (PELV current
source according to EN 60204-1).
Connection: "10 V" - "GND" (max. load
During an overload or short-circuit (10 V - GND), the control voltage (and thus the device) is
disconnected . Automatic start after elimination of the cause of error.
It is not permissible to connect outputs of several devices to each other!
5.9

Relay output "K1" for fault indication

An external fault indicator is available over the potential-free contact of the built-in relays (max. contact
rating
Technical data and connection diagram).
For operation the relay is energized, connections "11" and "14" are bridged. For fault the relay is de-
energized.
Information
After switching on the line voltage, an initialisation time of a maximum 7.5 seconds is required for the
device's electronics to be operational. Subsequently, a reliable status message will be possible. If no
malfunction is detected, the relay will be energised after the initialisation time.
Since both line voltage fluctuations and ambient conditions affect the initialisation time, a different
delay might occur in individual cases.
5.10

MODBUS (RS-485) interface

Via the MODBUS interface (terminals "A" and "B") Siemens customer service can check the operating
state of the fan.
5.11

Potential at control voltage connections

The control voltage connections (< 50 V) relate to the joint GND potential (Exception: Relay contacts
are potential free). There is a potential separation between the control voltage connections and the
protective earth. It must be ensured that the maximum external voltage at the control voltage
connections cannot exceed 50 V (between "GND" terminals and "PE" protective earth). If necessary, a
connection to the protective earth potential can be established, install bridge between "GND" terminal
and the "PE" connection (terminal for screening).
L-BAL-F065-GB 1617 Index 004
Technical data und connection diagram).
Part.-No. 00702801-GB
19/28
Electrical installation
185

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Simotics m-1ph822

Tabla de contenido