SEcTIoN 2
WaRNINg
2.11 ESP-200 Torch connections
1 .
Torch connections are first made in the PCC-14 plumbing box . Remove the cover of the plumbing box to access input
and output connections . For both manual and mechanized torch applications, pass the torch lines through the
openings in the front of plumbing box and make connections as shown .
lines from torch
1
Shield Gas Hose
2
Coolant Return Hose
3
Plasma Cut Gas Hose
4
Electrode Cable/Coolant Supply Hose
5
Switch Lead (PT-26 manual torch only)
The PT-26M requires an auxiliary pilot ON switch box . Switch Lead, Item Number 5, is not in-
1
Shield gas
Water IN (+)
2
(Pilot arc)
3
Plasma/Start gas
4
Water oUT (-)
(Electrode)
ElEcTRIc SHocK caN KIll!
TURN oFF PRIMaRY INPUT PoWER aT THE Wall DIScoNNEcT Box
BEFoRE MaKINg aNY coNNEcTIoNS To THE ESP-200.
1
2
3
4
5
cluded in the PT-26M torch bundle .
4
DEScRIPTIoN / INSTallaTIoN
Note:
1
3
29
2