4.2.4
Connecting the coarse dirt outlet
F
The coarse dirt that collects in the dirt channel drains away via the 4 in (DN 110) coarse dirt outlet (top
outlet on the container on the inlet side).
► For easiest connection of the 4 in (DN 110) outlet, a flexible coupler is better suited than a PVC
plumbing fitting.
► Connect a suitable 4 in (DN 110) pipe and drain the dirty water into the sewer system.
4.2.5
Connecting the dirt outlet
The water in the container can be drained via the dirt outlet with the slide valve at the bottom of the
container when required (for cleaning, repair, winter storage).
► Connect a suitable pipe using the DN 75 / 3 in adapter and drain the dirty water into the sewer
system.
How to proceed:
G
1. Remove the cap nuts and push the dirt outlet onto the connection.
2. Fit and tighten the cap nuts, tighten the hose clip.
3. Use the DN 75 / 3 in adapter to connect the pipe.
Connect the 3 in (DN 75) pipe with the 4 in (DN 110) pipe for coarse dirt and drain the dirty water into
the sewer system through the 4 in (DN 110) pipe. This will ensure that the dirty water pipe will be
conveniently flushed out with sufficient pressure.
4.3
Connecting the control system with EGC box
4.3.1
Connecting the control system
The cable harness contains the connection cables of the signal box, the drum motor and the rinsing
pump. These connection cables have to be connected, the EGC box is already connected.
H
► Connect the three connectors of the cable harness to the sockets of the control system and the
capacitor box. Hand-tighten the union nuts.
– The connections are designed to prevent reverse polarity.
– First flood the container with water, then connect the control system to the mains voltage/power
supply.
4.3.2
Connecting the EGC box
Integration of the filter system into the EGC network is optional and not necessary for operation.
(→ Easy Garden Control System (EGC))
The Connection Cable EGC cable is required for connecting the EGC box.
The correct fastening of the plug connector is important for a secure connection and an interference-free
EGC network.
How to proceed:
H, K, L
1. Remove the protection cap from the unit.
2. Fit the plug connector and secure with the two screws (max. 2.0 Nm (max. 18 lb-in)).
– Ensure that the rubber seal is clean and fits exactly.
– Replace the rubber seal if damaged.
3. Remove the protection cap from EGC-OUT of the last unit in the EGC network, fit the terminal
resistor EGC and secure it with the two screws (max. 2.0 Nm (max. 18 lb-in)).
– Ensure that the terminal resistor EGC instead of an EGC connection cable is installed on EGC-
OUT of the last unit in the EGC network to ensure that the EGC network is closed off properly.
– The scope of delivery of InScenio FM-Master EGC or InScenio EGC Controller each contains a
terminal resistor EGC.
Questions, problems, missing parts?
Before returning to your retailer, call us at 1-866-627-3435, 8 a.m.-6 p.m., EST, Monday-Friday, or email
us at customercare@oase-livingwater.com. Or visit our website at www.oase-livingwater.com
- EN -
19