Prepare Reagent; Install The Analyzer Bottles - Hach 5500sc Manual De Instalación

Ocultar thumbs Ver también para 5500sc:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86

Prepare Reagent 3

Reagent 3 is supplied as a liquid and a powder that must be mixed together before use. The
approximate shelf life of the prepared reagent is 4 months.
1. Remove the cap from the new liquid bottle #R3.
2. Put the funnel in the new liquid bottle #R3.
3. Add the powder to the liquid.
4. Tighten the cap on the bottle.
5. Invert the bottle again and again until the powder is dissolved.
6. Remove the cap from the bottle. Discard the cap.
7. Tighten the analyzer cap assembly on the bottle.
8. Put the bottle in the analyzer.

Install the analyzer bottles

Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
Refer to
Figure 15
to install the analyzer bottles. Make sure that the color and number on the cap is
the same as the color and number on the analyzer bottle.
Figure 15 Analyzer bottle installation
18 English
C A U T I O N

Publicidad

Tabla de contenido
loading

Tabla de contenido