3 Initial start-up
3.1 Important notes
• The voltage specified on the maker's plate and that of the local
power supply must match. The plant may only be connected to an
AC power supply.
• It is a compulsory that the operator has read the safety regulations.
• In the event that the plant is operated from a generator, the mains
supply voltage must not exceed that specified on the maker's rating
plate.
3.2 Assembling the shearing plant
Pay attention to sufficient fastening of the shearing plant.
3.2.1 Securing / suspending the shearing plant
The shearing plant can be suspended by means of a strong rope or
chain. The hole provided in the handle should be used to secure the
plant (Diag. 2, pos. c).
3.2.2 Assembling the flexible drive
• Start up the motor (see Chapter 3.3).
• Press the lock button located at the flexible drive's upper coupling
manually (Diag. 3, pos. b).
Diag. 2+3
• Now push the flexible drive coupling into the shearing plant's cou-
pling sleeve and then position this by means of slight pressure
upwards until the lock button engages in the hole (Diag. 3, pos. c).
3.3 Switching the shearing plant on / off
Important:
Make sure that the ventilation holes are always clear (Diag. 2+3,
pos. a). The shears drive remains switched off after the connec-
tion to the power supply. The shearing plant is switched on and off
respectively via the cord / lever (Diag. 2, pos. b). The drive is swit-
ched on by means of one downward pull, and is switched off again
Diag. 2
by repeating this operation.
Should the power supply be interrupted whilst the drive is running,
for safety reasons the motor switches off automatically, which means
that the unit must be switched on again via the cord / lever when the
power supply is re-established.
ONE Shearing Plant – Instruction Manual
9