Snap-On EEWB334A Manual De Operador página 39

Equilibradora de ruedas fuera del vehículo
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5-36
26
5-37
26
5-38
5-39
5-40
Fig. 5-36 OPTIMIZATION "OP.2"
START is signaled on the screen.
Spin the wheel
A compensation run is performed.
The screen "OP.3" as shown in Fig. 5-37 is displayed.
Fig. 5-37 OPTIMIZATION "OP.3"
Mount the tire correctly on the rim and infl ate
to specifi ed infl ation pressure (make sure the
mounting guide rim of the tire is correctly seated).
Confi rm by pressing menu key 26.
The OPTIMIZATION "OP.4" screen (Fig. 5-38) is
displayed.
Fig. 5-38 OPTIMIZATION "OP.4"
(fi rst measuring run of tire/rim assembly)
Clamp the wheel on the balancer.
Readjust the wheel such that the valve is exactly
perpendicular to and above the main shaft.
Enter the valve position by pressing menu key 26.
The OPTIMIZATION "OP.5" screen (Fig. 5-39) is
displayed.
Fig. 5-39 OPTIMIZATION "OP.5"
START is signalled on the screen.
Perform the measuring run.
A measuring run is performed.
The OPTIMIZATION "OP.6" screen (Fig. 5-40) is
displayed.
EEWB334A
39

Publicidad

Tabla de contenido
loading

Tabla de contenido