Grundfos CUE 150 Instrucciones De Instalación Y Funcionamiento página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6.3.1 Wiring diagram, signal terminals
0/4-20 mA
0-10 V
0-10 V
1 K
Fig. 17 Wiring diagram, signal terminals
Terminal Type
Function
12
+24 V out
Supply to sensor
13
+24 V out
Additional supply
18
DI 1
Digital input, start/stop
19
DI 2
Digital input, programmable
20
GND
Ground for digital inputs
32
DI 3
Digital input, programmable
33
DI 4
Digital input, programmable
39
GND
Ground for analog output
42
AO 1
Analog output, 0-20 mA
50
+10 V out
Supply to potentiometer
53
AI 1
External setpoint, 0-10 V/4-20 mA
54
AI 2
Sensor input, sensor 1, 0/4-20 mA
55
GND
Ground for analog inputs
61
RS-485 GND Y GENIbus, GND
68
RS-485 A
GENIbus, signal A (+)
69
RS-485 B
GENIbus, signal B (–)
Terminals 27, 29 and 37 are not used.
The RS-485 screen must be connected to ground.
Note
12
0/4-20 mA
Terminals
53 and 54:
See section
6.3.5
6.3.2 Minimum connection, signal terminals
Operation is only possible when the terminals 18 and 20 are
connected, for instance by means of an external on/off switch or
a short wire.
Fig. 18 Required minimum connection, signal terminals
6.3.3 Access to signal terminals
All terminals for signal cables are located beneath the control
panel and can be accessed by opening the door of the CUE.
See fig. 19.
Signal terminals
Fig. 19 Signal cable routing
6.3.4 Fitting the conductor
1. Remove the insulation at a length of 0.34 - 0.39 in (9-10 mm).
2. Insert a screwdriver with a tip of maximum 0.015 x 0.1 in
(0.4 x 2.5 mm) into the square hole.
3. Insert the conductor into the corresponding round hole.
Remove the screwdriver. The conductor is now fixed in the
terminal.
Signal relays

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cue 350Cue

Tabla de contenido