Apex iCH Prime Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
iCH Prime/English
3. Installation
3.1 Disassembling the Water Chamber
1. Turn the device off and allow the heater and water to cool. If necessary, disconnect the
flexible tubing from the water chamber.
2. Place thumb on the top of the water chamber and tip it upward as shown in Figure 3-1.
Remove the water chamber from the system.
3. Unlock the water chamber by pulling the tab as shown in Figure 3-2. Remove the chamber lid
3.2 Filling the Water Chamber
Figure 3-3
Figure 3-4
Figure 3-5
Figure 3-1
1.
2.
2.1 Insert the protruding tab into the groove
2.2 Put the top and bottom of the water chamber together
3.
4.
4.1 Position the water chamber on the heater plate
4.2 Tilt the water chamber, align with the air outlet (Figure
4.3 Push downwards until you hear a click (Figure 3-6)
4.4 Lock on the buckle to secure the chamber (Figure 3-7)
from the base.
Fill the chamber to the fill line
water (approx. 300 ml), as shown in Figure 3-3.
Follow the steps to assemble the water chamber:
If the silicon gasket has been removed, replace it
securely on the top edge of the water chamber base.
Otherwise, the device will not deliver air properly.
Follow the steps to install the chamber correctly:
3-4, 3-5)
Figure 3-6
Figure 3-2
with distilled
Figure 3-7
6

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido