Putting Into Operation - Hupfer EBR/70-120 Manual De Instrucciones

Ocultar thumbs Ver también para EBR/70-120:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 55
Chapter 4
Page 16
Figure 6
Step 3: Connect
Connect the appliance according to the wiring diagram: Insert the appliance plug of the connecting
lead set into the socket of the cup dispenser and the mains plug of the connecting lead set into the
on-site power supply socket.
Put thermally insulating plates around the appliance.
The appliance is ready to be put into operation.
4.3

Putting into Operation

Before the appliance is put into operation it must be clean and dry.
The function of the operating elements and heating in the heated appliances must be checked before putting
them into operation.
Cup Dispenser
EBR/70-120 | EBR/100-150 | EBRH/70-120 | EBRH/100-150
Assembly instructions
Transport, Assembly, Putting into Operation and Decommissioning
Putting into Operation
91285809_A0

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ebr/100-150Ebrh/70-120Ebrh/100-150

Tabla de contenido