Mettler Toledo IND560 Guia De Instalacion página 65

Ocultar thumbs Ver también para IND560:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. Attach the plastic bottom sealing plate to the Main board as shown in Figure
Figure 2-60.
Figure 2-60: Attaching the Plastic Bottom Sealing Plate
4. Place the small metal sealing plate from the sealing kit over the plastic
standoff beside the metrology security switch as shown in Figure 2-61.
Figure 2-61: Metal Sealing Plate
5. Screw the long sealing screw through the hole in the small metal plate through
the main board and into the plastic locking plate beneath the board.
6. Thread the wire cable through the hole in the sealing screw and the plastic
post as shown in Figure 2-62.
7. Remove any slack in the wire and snap the seal shut.
8. Reinstall the main board in the panel-mount enclosure.
9. Seal W1, the millivolt jumper, as shown in Figure 2-63.
IND560 Installation Manual
Figure 2-62: Sealing Wire
2-37

Publicidad

Tabla de contenido
loading

Tabla de contenido