EdilKamin BERING Instalación Uso Y Mantenimiento página 54

Ocultar thumbs Ver también para BERING:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
MAINTENANCE
SEASONAL CLEANING
(implemented by the dealer)
The Dealer will provide you, on the occasion of the fi rst start up, with the stove maintenance book, where the steps for
seasonal cleaning, outlined here below, are listed.
• Clean the boiler internally and externally
• Carefully clean the heat exchange tubes
• Carefully clean and remove dirt from the combustion chamber and the relative compartment
• Clean the motors, verify mechanical and clam loosening
• Clean smoke channel (replace seals on pipes) and smoke extraction fan chamber
• Check the expansion tank
• Check and clean the circulator
• Check the sensors
• Check and if necessary replace the clock battery on the control board
• Clean, inspect and scrape any residue from the ignition resistance compartment and if necessary, replace it
• Clean/check the Synoptic Panel
• Visually inspect the electrical wires, connections and power cable
• Clean the pellet hopper and check loosening of the feed screw - gear motor assembly
• Check and if necessary replace the door seal
• Functionality test: load the feed screw, ignite, let it run for 10 minutes and shutdown
If maintenance if not implemented, the warranty will be rendered null and void.
If the boiler is used very often, it is recommended to clean the smoke channel every 3 months.
When maintenance is implemented in the smoke channel, consider UNI 10847/2000 Individual chimney installations for
generators running on liquid and solid fuel. Maintenance and control.
The chimney stacks and smoke ducts to which solid fuel appliances are connected should be cleaned once a year (verify
whether in there are regulations in force in your country regarding this).
In the even that regular checks and cleaning are not performed the probability of a chimney fi re increases.
ATTENTION!!
After normal cleaning, INCORRECT coupling of the upper chamber (A) (fi g. 1) with the lower chamber (B) (fi g. 1) can
compromise boiler functioning.
Therefore, before igniting the boiler, make sure that the chambers are correctly coupled as indicated in (fi g. 2) without any
ash or unburnt fuel on the contact edges.
N.B.
- Any unauthorised modifi cation is forbidden
- Use spare parts recommended by the manufacturer
A
B
fi g. 1
fi g. 2
- 54
-

Publicidad

Tabla de contenido
loading

Tabla de contenido