Final Checks - Hoshizaki FM-1200ALKE Manual De Instalación

Ocultar thumbs Ver también para FM-1200ALKE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
6) The following should occur in sequence:
a) Water reservoir will fill.
b) Gear motor will start.
c) Compressor will start.
Operation Panel
Ice Button
Display
Maintenance Button
(service use only)
Fig. 12
IMPORTANT
1. Check the conditions and quality of the ice
production.
2. Do not use ice produced in the trial run. It
might be contaminated with foreign matter
in the water circuit. Discard or flush down
the drain.
3. Clean the storage bin before use (see "III. 1.
CLEANING" in instruction manual).

7. FINAL CHECKS

1) Is installation free of water leaks?
2) Is the icemaker free from vibration?
3) Are all the panels fixed and secure?
4) Has the user been instructed on correct machine
use and handed the instruction manual?
Stop Button
Operation Switch
7
ENGLISH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fm-1200alke-nFm-1800alkeFm-1800alke-n

Tabla de contenido