Final Checks - Hoshizaki FM-1000ALE Manual De Instalación

Maquina de cubitos modular
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
a) Water Reservoir will fill.
b) Gear Motor will start.
c) Solenoid valves will energise/open.
Note: Check the operation of the compressor system
and ensure a complete refrigerant charge.
8) After the icemaker has started, the evaporator
pressure should be checked. The Evaporator
Pressure Regulator should be adjusted to give a
running evaporator pressure of 2.02 bar (FM-
1000ALE) or 3.36 bar (FM-1000ALF).
9) Refit the Front Panel in its correct position.
Ice Button
Option Button
1. Check the conditions and quality of the ice
production. Change ice size if necessary (see
"II. 1. OPERATION" in Instruction Manual).
2. Do not use ice produced in the trial run. It
might be contaminated with foreign matter in
the water circuit. Discard or flush down the
drain.
3. Clean the Storage Bin before use (see "III. 1.
CLEANING" in Instruction Manual).
92U2CM20B0303
Control Box
Display
Stop Button
Operation Switch
Fig. 9
IMPORTANT

7. FINAL CHECKS

1) Is installation free of water leaks?
2) Is the icemaker free from vibration?
3) Are all the panels fixed and secure?
4) Has the user been instructed on correct machine
use and handed the Instruction Manual?
Fuse (1A)
Reset Switch
(Gear Motor)
5
ENGLISH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fm-1000alfFm-1000ale-nFm-1000alf-n

Tabla de contenido