2.
- Connecting the chamber
4
This operation only applies to models fitted with
an electrolyser.
A more detailed installation guide is supplied
with the chamber.
Note: water flows in a single direction within the
chamber.
Earth
Flow detector
The direction of flow is indicated by an arrow.
2.
- Electrical connections
5
The electrical connection must be carried
out by a qualified electrician in conformity
with the NFC I5-100 (Edition 2002) standard.
See diagram opposite.
If using electrolysers other than Energys, or a chlo-
rine meter pump :
- check if it is a class II device: there should be a
symbol on the device.
- if it is a class II device (
connection is identical to that for an Energys.
- if it is a class I device (no
of earth wires): the equipotential bonding (earth
wire) must be connected directly between the
device's box and the filtration box. The earth
cable must not pass via the Selwatch box.
pH- injection
(S
t
3-04,
elwatch
ype
3-05, 3-06
3-07)
and
pipe 1
Water sampling
(S
t
3-03,
elwatch
ype
3-04
3-05)
and
pipe 2
symbol, no earth): the
symbol, presence
N
Single-phase
220V
SWITCH
2
4
6
CONTACTOR
2
4
Pump
6
14
A2
CLOCK
ELECTROLYSER (E)
OR EXTERNAL
CHLORINE PUMP
(PCL)*
220V
50/60 Hz
4A max
4A-AM
Thermal-
magnetic
circuit
breaker
1
3
5
1
3
5
13
A1
M
.A
Manual
turn-on
18