Figure 3. Typical room layout
3
In this left had configuration
the condensate drain pipe
is on the left hand outlet.
Refer to design drawing for
further information.
The drain pipe must have a continuous minimum fall of 6cm per 1m run.
A condensate connecting point will already be provided as part of the building
design. The position of this point, relative to where the heat recovery unit is to
be installed, is to be checked for any appreciable connection misalignment and
necessary adjustment made before proceeding any further.
NOTE: The HRI Mini unit is pre-configured for drainage.
IMPORTANT: There must be a sufficiently large visible gap between the
condensate drain pipe termination and the collection point, to prevent
ice buildup.
30
FRESH
EXHAUST AIR OUT
AIR IN
WARM AIR
INTO RETURN
AIR GRILLE
WARM BATHROOM
STALE AIR EXTRACTED
4
Figure 4 Condensate drain configuration
RIGHT HAND DRAIN OUTLET