Installation
If the use of a brightness sensor 6414/glass breakage
detector 6413 is planned for the flush-type insert 6411U/S-
101, the factory-set line length of approx. 2 m must be
taken into account.
Attaching the operating element
First set the desired address on the 6066 IR operating
element (see chapter "Setting the address on the IR
operating element").
●
Attach the operating element onto the flush-mounted
insert
Removing the operating element
●
Use a screwdriver to lift the control element off with the
frame.
ENG
65