Operation; Switching The Pump On And Off; Configuration Of The Pump - Ecolab EcoAdd Serie Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 750
9

Operation

Personnel:
9.1

Switching the pump on and off

Fig. 85: EcoAdd
1
Touchscreen
2
On/off button
Input and settings are solely carried out via the touchscreen (Fig. 85, Pos. 1).
1.
The pump is switched on via the 'ON / OFF button'
2.
After activation, the pump is ready for operation.
ð When starting, the pump shows the information screen displaying the retrieved
technical data and the connected components.
3.
Pressing the 'start button'
4.
Pressing the 'pause button'
ð The 'operating screen' pauses and the pump goes into "standby" mode.
5.
By pressing the 'ON / OFF button'
again.
ð The 'operation screen' goes blank and the pump is switched off.
9.2

Configuration of the pump

The pump must be configured before operation and this process is described
Ä Chapter 7.10 'Overview - Configuration' on page 87.
in:
n
Production supervisor
n
Operator
n
Specialist
initiates the pump operation.
stops the pump operation.
131
3
USB connection for data transfer
(Fig. 85, Pos. 2).
(Fig. 85, Pos. 2) the pump can be switched off
Operation
417102276 Rev. 3-01.2019

Publicidad

Tabla de contenido
loading

Tabla de contenido