Ballast Installation
Requirements
Shock Hazard. May result in serious
WARNING
injury or death. Disconnect power
before servicing or installing.
Sockets
Sockets MUST comply with IEC 60400.
Inspect sockets for marks to ensure the socket complies with IEC 60400. Two examples of these
E
Q
marks are:
and
. Sockets must have a
DO NOT use Instant Start sockets.
See LutronR App Note #122 or NEMA doc LSD-34-2006.
Rapid Start
(Rotary Locking)
Socket Wiring:
Use 18 AWG (0.75 mm
) solid copper or tinned stranded wire. Refer to ballast label and socket
2
manufacturer for proper strip length.
Make sure yellows are wired in parallel, not in series.
Correct
Lamp Socket Wiring Tester
Use Socket Tester (FDB-LSWT-T5/T8) to verify proper lamp holder wiring.
Ballast Mounting
Mount ballast flush against fixture to provide best heat transfer. Also, avoid mounting ballast close to
heat source such as fixture cover plate.
Correct
Incorrect
Lamp
Ballast
Side by side mounting
Ballast
Must be at least 6 in (150 mm) apart.
Balasto
Ballast
Lamp Mounting Height Requirements:
Lamp Type
Mounting Height
T8 Linear
1/8 to 3/4 in (3.2 to 19.1 mm)
T5 Linear
1/16 to 3/8 in (1.6 to 9.5 mm)
T5 TwinTube
1/16 to 1/2 in (1.6 to 12.7 mm)
Lutron Electronics Co., Inc. | 7200 Sute Road
Coopersburg PA, 18036-1299, U.S.A.
EcoSystem
| Hi-lume
041-361 Rev. A
®
10/2011
Need Help? www.lutron.com or call the Lutron Technical Support Center, 24/7 at 1.800.523.9466
WARRANTY: For Lutron's ballast warranty, please visit; www.lutron.com | Lutron's warranty does not cover costs or damages caused by misapplication or improper installation.
Z
mark as well. Use Rapid Start sockets.
Rapid Start
Rapid Start
(Slide-In)
(Compact)
Incorrect
When installing more than one ballast in a
Lamp
fixture, contact Lutron Technical Support at
Ballast
1.800.523.9466 for specific guidelines to
maximize performance.
Lamp
Ballast must be electrically grounded for
proper performance and to meet UL
Lamp
requirements. Grounding should be
accomplished with paint piercing mounting
hardware to ensure electrical connection
through ballast enclosure and through fixture.
Lamp
Ballast
IMPORTANT:
Lamps must never touch ground
plane and should be placed without obstruction.
Lamp Socket
Lamp
(side view)
Mounting height
Grounded
Ballast
metal
Lutron, EcoSystem, Hi-lume, and
are registered trademarks of Lutron Electronics Co., Inc. NEC is a registered trademark of the National Fire Protection Association, Quincy, Massachusetts. UL is a registered trademark of Underwriters Laboratories, Inc. NEMA is a registered trademark and service
mark of the National Electrical Manufacturers Association. IEC is a trademark of the International Electrotechnical Commission. The VDE Mark is registered, protected and recognized as a safety mark in more than 30 countries. The ENEC Mark is registered by the signatories in their own country.
3D | H-Series
®
Lamp Wiring
Socket Lead Length Requirements:
Lamp Type
T5 Linear
T8 Linear
T8 U-Bend
T4 Compact
T5 Twin Tube
Ballast wire strip lengths:
For power, output, and
digital terminals (E1, E2).
For control and sensor
terminals.
Wiring to three lamps
Blue
BLU
BLU
YEL
YEL
Yellow
Striped
B/W
B/W
Red
RED
RED
Power Wiring
EcoSystem R Link can be Class 1
Power Input
(Line Voltage):
or IEC PELV/NEC R Class 2:*
NEU.
DH
SH
& NEC
®
®
Optional for
EC5 & EC3D
18 to 16 AWG
18 to 16 AWG
only
(0.75 to 1.5 mm
2
)
(0.75 to 1.5 mm
solid copper
solid copper
Lamps
Temperature: Avoid operating with
cold air blowing directly on lamps.
Max. Length of Leads
(ballast to socket)
Lutron
the lamps when the lamp temperature
7 ft (2.1 m)
is at a minimum of 50 ºF (10 ºC).
See lamp manufacturer's specifications
for maximum lamp temperature.
3 ft (1.0 m)
For proper wiring:
Follow wiring schematic on ballast.
5/16 in
Solid copper
(8 mm)
18 AWG
EcoSystem
(0.75 mm
2
) wire
5/16 in
Solid copper
(8 mm)
22 AWG
(0.25 mm
) wire
2
H-Series
Note: Wire in parallel
E1
E2
*
NOTE: IEC PELV/NECR Class 2 must be
separated from Class 1 and line voltage wiring by
the following: 0.25 in (6 mm) or physical barrier.
Please refer to App Note #142 for further information.
To the
2
)
EcoSystemR
Link & up to
64 total ballasts
Ballast
Terminals
ballasts are designed to strike
®
& Hi-lume
3D
®
®
EcoSystem
Link Wiring
R
Wire Gauge
Digital Link
Length (max)
12 AWG
2200 ft
14 AWG
1400 ft
16 AWG
900 ft
18 AWG
550 ft
Wire Gauge
Digital Link
Length (max)
4.0 mm
2
828 m
2.5 mm
2
517 m
1.5 mm
2
310 m
1.0 mm
207 m
2
0.75 mm
155 m
2