Intended Use; Scope Of Delivery; Electrical Voltage; Potentially Explosive Atmosphere - Bühler technologies TC-Double Guía Rápida

Ocultar thumbs Ver también para TC-Double:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
TC-Double (+)
1 Introduction
This quick guide will assist you in starting up the unit. Follow
the safety notices or injury to health or property damage may
occur. Carefully read the original operating instructions in-
cluding information on maintenance and troubleshooting
prior to startup. These are located on the included CD and on-
line at
www.buehler-technologies.com
Please direct any questions to:
Bühler Technologies GmbH
Harkortstraße 29
40880 Ratingen
Germany
Tel.: +49 (0) 21 02 / 49 89-0
Fax: +49 (0) 21 02 / 49 89-20
These operating instructions are a part of the equipment. The
manufacturer reserves the right to change performance-, spe-
cification- or technical data without prior notice. Please keep
these instructions for future reference.

1.1 Intended use

This unit is intended for industrial use in gas analysis systems.
It's an essential component for conditioning the sample gas to
protect the analysis instrument from residual moisture in the
sample gas.
Please note the specifications in the data sheet on the specific
intended use, existing material combinations, as well as pres-
sure and temperature limits.
1.2 Overview
The TC-Double series was designed specifically for high cool-
ing capacities, high ambient temperatures and to cool in two
cycles to minimise wash out effects. The two cooling blocks on
the TC-Double+ can be set do different temperatures.
Additional components which every conditioning system
should feature can optionally be integrated:
• Peristaltic pump for condensate separation
• Filter
• Sample gas pump
• Moisture detector
This allows for various configurations of cooler and options.
Here the approach is to simplify creating a complete system in
a cost-efficient way through pre-installed components with
hoses connected. We further paid attention to easy access to
wear parts and consumables.

1.3 Scope of delivery

• Cooler
• Product documentation
• Connection-/mounting accessories (optional)
2 Safety instructions
The equipment must be installed by a professional familiar
with the safety requirements and risks.
Be sure to observe the safety regulations and generally applic-
able rules of technology relevant for the installation site. Pre-
vent malfunctions and avoid personal injuries and property
damage.
10
Bühler Technologies GmbH
The operator of the system must ensure:
• Safety notices and operating instructions are available
and observed,
• The respective national accident prevention regulations
are observed,
• The permissible data and operational conditions are
maintained,
• Safety guards are used and mandatory maintenance is
performed,
• Legal regulations are observed during disposal.
DANGER

Electrical voltage

Electrocution hazard.
a) Disconnect the device from power supply.
b) Make sure that the equipment cannot be reconnected to
mains unintentionally.
c) The device must be opened by trained staff only.
d) Regard correct mains voltage.
DANGER
Toxic, corrosive gas/condensate
Sample gas/condensate may be hazardous to health.
a) If necessary, ensure a safe gas/condensate discharge.
b) Always disconnect the gas supply when performing
maintenance or repairs.
c) Protect yourself from toxic/corrosive gasses/condensate
when performing maintenance. Wear appropriate pro-
tective equipment.
DANGER

Potentially explosive atmosphere

Explosion hazard if used in hazardous areas.
The device is not suitable for operation in hazardous areas
with potentially explosive atmospheres.
Do not expose the device to combustible or explosive gas mix-
tures.
3 Transport and storage
The product should only be transported inside the original
packaging or a suitable alternative.
When not in use, the equipment must be protected from
moisture and heat. They must be stored in a covered, dry and
dust-free room at a temperature between -20 °C and 60 °C.

4 Installation and connection

4.1 Installation site requirements

The unit is only intended for wall-mounted use in enclosed
areas. Adequate protection from the weather must be
provided when used outdoors.
Install the unit leaving enough room below the cooler to dis-
charge the condensate. Leave room above for the gas supply.
BX440021 ◦ 06/2017

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tc-double+

Tabla de contenido