Sime MURELLE 25 OF ErP Manual De Instrucciones página 85

Ocultar thumbs Ver también para MURELLE 25 OF ErP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.4 
MAINTENANCE
To. guarantee. functioning. and. efficiency. of.
the.appliance,.in.respect.of.the.legal.provi-
sions.in.force,.it.must.be.regularly.checked;.
the.frequency.of.the.checks.depends.on.the.
type. of. appliance. and. the. installation. and.
usage.conditions.
In.any.case,.it.should.be.inspected.at.least.
once.a.year.by.a.qualified.technician.
Carry. out. the. cleaning. of. the. generator. in.
the.following.way:
–. Turn.the.main.switch.off.to.stop.electric.
power. reaching. the. boiler. and. close. the.
gas.feed.cock.
–. Remove.the.outer.casing.and.the.gas.bur-
ner. manifold. unit.. To. clean. the. burner,.
Apre
blow. in. a. jet. of. air,. so. as. to. remove. any.
dust. particles. that. may. have. accumula-
ted.
–. Clean. the. heat. exchanger,. removing. any.
dust. or. residue. from. combustion.. When.
cleaning. the. heat. exchanger. or. the. bur-
ners,.chemical.products.or.steel.brushes.
MUST.NOT.BE.USED.
. Make. sure. that. the. tops. of. the. burners.
5
with. the. holes. are. free. from. encrusta-
tions.
–. Reassemble.the.items.removed.from.the.
3
boiler,.making.sure.to.follow.the.correct.
sequence.
1
–. Check.operation.of.the.main.burner.
–. After.assembly.of.all.the.gas.connections,.
2
these. must. be. tested. for. soundness,.
using. soapy. water. or. appropriate. pro-
2
ducts..DO.NOT.USE.NAKED.FLAMES.
–. Do. not. use. calcium. chloride. to. treat.
4
the. plastic. component. during. generator.
maintenance..
4.4.1 
Chimney sweep function (fig. 22)
To. check. boiler. combustion,. press. the.
installer's.key.
.for.a.few.seconds..
The. chimney. sweep. function. will. switch. on.
and.will.continue.for.15.minutes..From.that.
moment,. the. boiler. will. start. working. in.
heating.mode.at.maximum.power,.with.cut.
off.at.80°C.and.re-ignition.at.70°C.
Fig..22
Before  activating  the  chimney  sweep  fun-
ction make sure that the radiator valves or 
eventual zone valves are open.
The. test. can. also. be. carried. out. with. the.
boiler.working.in.D.H.W..mode..
For.this,.after.activating.the.chimney.sweep.
function,. open. one. or. more. hot. water. fau-
cets..Under.these.conditions,.the.boiler.will.
5
5
function.at.maximum.power.with.the.D.H.W..
kept.at.between.60°C.and.50°C..During.the.
test,. the. hot. water. faucets. must. remain.
open.
3
3
If.the.key.
.and.
.are.pressed.during.the.
15.minutes.of.the.chimney.sweep.function,.
1
1
the. boiler. will. be. brought. respectively. to.
5
maximum.and.minimum.power.
The chimney sweep function will automati-
cally  switch  off  after  15  minutes  or  when 
2
2
3
. is pressed again.
the key .
4
4
1
4.4.2 
Cleaning the filter "Aqua Guard 
Filter System" (fig. 23)
2
To.clean.the.filter,.close.the.delivery/return.
on/off.taps,.turn.off.the.power.to.the.control.
panel,. remove. the. casing. and. empty. the.
4
boiler.using.the.drain.provided..
Place.a.container.for.collection.underneath.
the. filter,. unscrew. the. cap. and. proceed. to.
clean. the. filter,. removing. impurities. and.
limestone.deposits..
Check.the.seal.o-ring.before.reassembling.
the.cap.with.the.filter.
2
4.4.3 
Operation floor drying (fig. 23/a)
The.operation.floor.drying.keeps.the.floor.at.
a. pre-established. temperature. profile. and.
it. is. activated. only. for. those. systems. com-
bined. with. the. mixed. zone. card. ZONA.MIX.
code. 8092234.. The. temperature. profiles.
can. be. selected. by. means. of. the. installer.
parameter.PAR.43:.
[TVw]
55
50
45
40
35
30
2
25
20
0
1
5
X
A
1
TVw.
Flow.temperature.setpoint
Tag.
Period.in.days
x.
Start.day
A.
Functional.heating
B.
Floor.curing.heating
0.=.Not.activated.function
1.=.Curve.setting.A
2.=.Curve.setting.B
3.=.Curve.setting.A.+.B
The. turning. off. of. . the. function. happens.
clicking.on.the.button.OFF.(return.of.PAR.43.
to.the.value.0).or.automatically.at.the.end.of.
the.function..
The.set.of.the.mixed.zone.follows.the.deve-
lopment.of.the.selected.curve.and.reaches.
a. maximum. of. 55°C.. During. the. function.
Circuito
all. the. other. heating. demands. are. ignored.
riscaldamento 2
(heating,. sanitary,. antifreeze. and. chimney.
sweep)..
During. the. functioning. the. display. shows.
the. remaining. days. for. the. completion. of.
Circuito
the.function.(example.mains.digits.-15.=.15.
riscaldamento 3
(impianto tre
days. lack. to. the. end. of. the.
zone)
diagram. fig.. 23/a. reports. the. development.
of.the.curve.
ATTENTION:
-   Observe  the  relevant  standards  and 
regulations of the floor manufacturer!
-   Proper functioning is ensured only when 
the plant is correctly installed (hydrau-
lic  system,  electrical  installation,  set-
tings)!  If  not  observed,  the  floor  might 
get damaged!
7
1
5
10
B
A + B
ENG
Fig..23
function)..
The.
15
18
[Tag
]
25
Fig..23/a
85
ES
PT

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Murelle 30 of erp

Tabla de contenido