Handling and lifting the packed unit
WARNING
Lift the packed machine using appropriate hoisting
means for the load to lift.
All the information for safe loading/unloading procedures is printed on the packing.
UN41-0077GF
Unpacking and assembly
During unpacking, check that the components are in
good condition and tally with the number stated; in the
event of damage, report the damage to the retailer or
directly to the manufacturer within 8 days of receiving
the machine.
The packing materials must be appropriately disposed
of or recycled in accordance with the laws in force.
The illustration provides a rough outline of the work vehicle assembly divided into two units.
BABY TRIUM-DT/5
BABY TRIUM-DT/6
UN41-0170LG
English language
INFORMATION CONCERNING HANDLING AND INSTALLATION
NOTICE
Check the parcel weight stated on the packing itself.
WARNING
The assembly of the work vehicle must be carried out
at an authorised service centre or at company facili-
ties equipped with appropriate equipment and suit-
ably trained personnel, in order to guarantee safety
during unpacking and installation.
14
4
Use and maintenance