Bottom View
5. Secure the Receptor
Apply beads of foam base adhesive on the ridges on the bottom of the receptor.
Reposition the receptor and press down firmly to ensure good adhesive contact.
Recheck level as this will play a critical role in door alignment.
Locate and drill 3/16" clearance holes in the center of the nailing flange, centered on each stud.
Thread a drywall screw (not provided) through each hole and into the studs, securing the receptor.
Sterling
9
Top View
Nailing
Flange
1100676-2-C