Only the professionals qualified for electrical operation are allowed to conduct the electrical installation.
Open the upper cover of the control cabinet first
- Connection of power line: Connect the 400V three-phase four-wire power line (cable of 3×2.5MM
control cabinet interfaces L1, L2, L3 and input terminal, and connect the PE grounding wire to the labeled grounding
bolt first and then to the labeled grounding bolts at the bottom of the two platforms (Fig. 6).
- In case of 230V three-phase power source, it is required to adjust the wiring of control transformer and the motor (Fig. 7).
L1 L2 L3 PE
Fig. 6
The limit switch of the main lift is installed in the switch frame at the bottom of the main lift crossbeam (Fig. 8), and the lead is connected
to the terminal in the control cabinet after passing through the embedded PVC duct;
The limit switch of the sub lift is installed in the switch frame at the base frame of the sub lift (Fig. 9), and the lead is connected to the
terminal in the control cabinet after passing through the embedded PVC duct;
Fig. 8 (Limit switch of main lift)