中文
AE5401/AE5401-3
EN
DE
RU
KO
PT
JA
ES
Leveling: The level precision of the machine is a precondition of the precise detection for four-wheel alignment, therefore the machine
leveling is significant.
Lift the main lift platform to the fifth or sixth gear, then press the "Lock" button to fasten the safety jaws of the left and right platforms
into the safety gear rack firmly.
Inspect that the surfaces of the left and right platforms are level laterally and longitudinally with a transparent leveling pipe or level gauge
(Fig. 24)
Fig. 24
If the uneven platform is caused by the uneven foundation, adjust the adjusting bolts (Fig. 25) on the base frame of the main lift with a
wrench to make the platform's level precision meet the detection requirements of four-wheel alignment.
1) After the leveling, insert the central expansion screws of foundation bolts, and fix the expansion screws with a heavy hammer.
2) Tighten the nuts of the foundation bolts.
3) If the concrete curing period is not over, do not hammer the central expansion screws of the foundation bolts. After leveling, the
clearance between the base frame and the ground must be filled with cement mortar.
Low position leveling: When the main platform is lowered to the lowest position, the level of the platform in the low position can be
adjusted by the supporting screw rods at the bottom of the main platform (See Fig. 26).
1) Loosen the set nuts first.
2) Adjust the length of the supporting screw rod to the proper position.
3) Tighten the nut.
Fig. 25
Fig. 26
52