Maintenance; Safety-Relevant Information; Functional Check; Table Of Functional Checks - Steelcase Flex Collection Desk Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
_______________________________________________________________
7

Maintenance

7.1 Safety-relevant information

Only appropriately qualified and
authorised personnel may carry out
maintenance and repair work.
Only use suitable tools for all these
operations.
A damaged mains cable of this unit must
be replaced by the manufacturer, his
customer service or similarly qualified
personnel to prevent hazards.

7.3 Table of functional checks

Interval
Inspection point
Regularly
Fastening elements of
the height-adjustable
desk Flex
Connections of the
electrical supply lines
(cables)
Insulation of the
electrical supply lines
(cables)
Surroundings of the
electrical supply lines
(cables)
Table 7-1: Functional check

7.4 Maintenance work

Only authorised and qualified personnel may carry
out maintenance work. For more information, please
contact our Customer Service Department. (see
Service
).
Before adjusting the height of the desk, ensure that
the desktop
156631

7.2 Functional check

The Flex Height-Adjustable Desk components
must be checked for correct functionality at regular
intervals. Pay particular attention to the electrical
connections:
The electrical equipment of the desk must
be checked regularly. Rectify defects such
as loose connections or damaged cables
immediately.
Attach or detach connectors only when
the equipment is de-energised.
The plug of the desk must be easily
accessible at all times.
Functional check
Required condition
Fastening
All screws and other
fastening elements are
tightened / fixed
Check the insulation for
No damage
damage
Check the insulation for
No damage
damage
Check clearance to hot
Sufficient distance
objects (e.g. radiators)
is horizontal. If the floor is uneven, align the desktop
via the adjusting wheel on the feet.
Ensure that there are no objects in the movement
range of the lift column!
9
Maintenance
Measure (if required)
Retighten screws / fix
fastening elements
Replace the connections
Replace the cables
Establish distance
23
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido