RIB ARROW Instrucciones Para El Uso Y La Instalacion página 22

Dispositiovo operador para puertas correder
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pag. 22 di 44
DOOR INSPECTION
1) Check the dimensions of the actuator and aluminium frame and that
data corresponds to order data.
2) Ensure that the floor is completely level
3) Check that the mains power supply corresponds to specifications for
the actuator input voltage
4) Ensure that the actuator support structure is sufficiently solid to
withstand the weight of the track and door and that it is securely
fixed into position.
5) Check the opening height on both sides of the door
6) Measure the total opening width.
7) Measure the width of the door
8) Measure the height of the door

Publicidad

Tabla de contenido
loading

Tabla de contenido