5.2 Operation

igure 18: Recommissioning / Save (A) and Load (B)

5.2.1 Recommissioning

After commissioning is completed by entering the
SMA Grid Guard codes, it is possible to restart
operation of the Inverter Manager.
Procedure:
INFORMATION
Pressing the [recommissioning] button
automatically logs out the user who is currently
logged in.
Procedure:
1. Open the LCS-Tool.
2. Log in as an Installer.
3. Open the Setup > General menu.
4. Select the [recommissioning] button.
Installation Manual
5.2.2 Saving and Loading a
Confguration File
After commissioning is completed by entering the
SMA Grid Guard codes, it is possible to save the
confguration of the Inverter Manager in a
confguration f le. This co nf guratio n f le can be
loaded again at a later time. Loading the
confguration f le restores the co nf guration state of
the Inverter Manager after commissioning.
Procedure:
1. Open the LCS-Tool.
2. Log in as an Installer.
3. Open the Setup > General menu.
4. To save the confguration of the Inverter
Manager, select the button (A).
5. To load the confguration of the Inverter
Manager, select the button (B).