iSTM
1
6
Wire liner
1
iSTM ECO Cable assembly
2
Mounting the wire liner
Fig. 10
7 Operation
8 Putting out of operation
2
Contact tip
3
Insulation Sheathing
4
1 Lay out the iSTM ECO cable assembly (2) in stretched position.
2 Introduce wire liner (1) through the iSTM ECO cable assembly (2) into the
contact tip (2) all the way.
3 Determine excess length x of the wire liner (1) and remove wire liner (1)
again.
4 Shorten the determined excess length x + 10 mm from the front.
5 Remove 300 mm of the insulation sheathing (4) from the wire liner on the
torch side.
6 Remove the burr formed by the shortening operation at the wire liner (1).
7 Mount wire liner (1) with excess length (10 mm maximum) in the iSTM ECO
cable assembly (2).
8 Mount wire liner (1) in the iSTM ECO cable assembly (2) and screw in nut
(5).
For the O-ring (6), please make sure the following:
9.2 Cleaning the iSTM ABIROB
Due to the fact that the iSTM is integrated into the welding process of the torch,
the operating steps are performed after the respective torch has been put into
operation. Please observe the operating instructions of the respective
®
A, ABIROB
ABIROB
Putting out of operation depends on the respective welding torch.
3
5
6
®
W on page EN-18
®
®
W, ABIROB
GC welding torches.
7 Operation
4
5
Fastening nut
O-ring
EN - 15