3. INSTALL HOOD MOUNTING BRACKET
• When cutting or drilling into wall, do not damage electrical wiring and other hidden utilities.
• When building framework, always follow all applicable construction codes and standards.
Construct wood wall framing that is even with the surface of wall studs.
Wood wall framing must be at least 1/2" thick and 3" high. Fasten wood wall
framing to wall studs for a solid installation.
Make sure that the height of the framing will allow the mounting bracket to be
secured to the framing within the dimensions shown (see illustration at right).
After wall surface is finished, using a level, draw a vertical line up to the
ceiling starting from the center of the planned hood location. Carefully center
and level the hood mounting bracket over installation location. Secure it to wall
framing using 3 #8 x 1-1/2" Phillips flat head screws.
4. INSTALL UPPER FLUE MOUNTING BRACKET (
Center the upper flue mounting bracket with the center line previously
drawn in step 3 and place it flush with the ceiling. Use the upper flue
mounting bracket as a template to mark the position of its screws.
Secure the upper flue mounting bracket to the wall using 2 #8 x 1-1/2"
Phillips flat head screws. Make sure that the bracket is tight against the
wall.
5. INSTALL PLENUM (
Center the plenum with the center line previously drawn in step 3 and
place it flush with the ceiling. Use the plenum mounting slots as a
template to mark the position of its screws.
Secure the plenum to the wall using 2 #8 x 1-1/2" Phillips flat head
screws. Make sure that the plenum is tight against the wall.
WARNING
!
-
NON
DUCTED INSTALLATION ONLY
HD1267A
36
1
/
" =
8
BOTTOM OF HOOD
1
42
/
" =
8
BOTTOM OF HOOD
DUCTED INSTALLATION ONLY
C
EILING
C
U
PPER FLUE MOUNTING
BRACKET SLOTS
HD1150
)
P
LENUM
MOUNTING
SLOTS
HD1275
4
W
ALL STUDS
F
RAMING BEHIND DRYWALL
24"
ABOVE COOKTOP
30"
ABOVE COOKTOP
)
ENTER OF INSTALLATION
M
OUNTING BRACKET
C L
FLUSH WITH CEILING
C
EILING
P
LENUM
FLUSH WITH
CEILING
C
C
L
ENTER OF
INSTALLATION