Frequency ()
Every 900 hours
Every 1200
hours
Every 4000
hours
Every 4000
hours
Every 8000
hours
(1) If an hour counter is not available, the frequency of
the interventions should be calculated on the basis of
a calendar day: one calendar day corresponds to 12
hours of operation.
(2) In hard working conditions, such as dusty environ-
ments and operation with extreme loads, change the
oil of the engine and the oil filter every 150 working
hours. If the engine has not worked for the specified
time, it will be necessary to replace the oil and the
filter all the same once a year.
The engine oil must in any case be changed, even
before the time limit indicated in the scheduled
maintenance programme, if the MIL
light comes on with the ECU error 252F - "Engine oil
critical mass". .
(3) If the engine has not been in operation for the
length of time indicated, the filter must still be changed
at least once every 12 months.
(4) If the engine has not been in operation for the
length of time indicated, the fluid must still be changed
at least once every 24 months.
(5) If the engine has not been in operation for the
length of time indicated, the belt must still be changed
at least once every 24 months
English
Type of inter-
Component
vention
Drive belt (type
Replace
Poly-V) (5)
Clean the fuel
tank and check
fuel tank
the efficiency of
the filler cap.
Replace the
Air filter
clogging indi-
cator
Coolant (4)
Replace
Antiparticulate
Perform the
filter
regeneration
Performing
Engine
partial overhaul
Performing ge-
Engine
neral overhaul
indicator
indicator
R750EU5 - IE3 - TE4 - IE4 - ISE4
Intervention
procedures
Apply to an
authorised
workshop
Apply to an
authorised
workshop
Apply to an
authorised
workshop
(6) In engine R756EU5 models with a high capacity
oil sump, a special plate is applied on the cover of the
engine valves to indicate that the engine oil and the oil
filter must be changed every 500 hours instead of every
300.
500 oRE
500 HoURS
Periodic maintenance operation record sheet
For each maintenance operation, fill in the sheet,
so as to keep a trace of the operations performed
and therefore establish the most suitable methods
for future operations.
39
Reference
See "Changing
t belt (type
Poly-V)"
See "Coolant
replacement"
Ed.8 / 0-202
GB