Connecting The Cooling System - Abicor Binzel AUTC 61GD Instructivo De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Putting into operation
6.3 Mounting the machine side cable assembly
1
8
1
Cable assembly
2
Connection nut
3
Central connector
Fig. 3
Mounting the cable assembly on the machine side

6.4 Connecting the cooling system

EN - 10
2
4
Wire basket spool
5
Shielding gas cylinder
6
Power supply
NOTE
• Check once again whether the wire guide liner has been fastened
correctly.
1 Combine central connector (3) and central socket (8) at the wire feed unit
(6) and secure them with the connecting nut (2).
WARNING
Risk of burns
MAG will become overheated if the coolant level is too low.
• Wear protective gloves.
• Check the coolant level at regular intervals.
NOTE
• Applies only to liquid-cooled MAG welding torches.
• Make sure that the coolant supply and return have been installed
properly. Coolant supply = blue, Coolant return = red.
• Make sure that liquid-cooled MAG welding torches are only operated
with the ABICOR BINZEL coolant BTC-15.
3
7
7
Wire feed unit
8
Central socket
MAG
4
5
6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aut 610d

Tabla de contenido