Installing The Instrument; Pin Assignment - WIKA GDT-20 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5. Commissioning, operation
5.1.2
Installation using an adapter and measuring chambers
EN
The process connections of the available adapters and/or measuring chambers are to
be properly sealed and connected to the measuring location.
5.1.3

Installing the instrument

When screwing in the instrument, the force required to do this
must not be applied through the case, but only through the
spanner flats provided for this purpose and using a suitable tool.
The torque should maximally be 60 Nm when screwing it in.
When screwing in, do not cross the threads.
5.2 Electrical mounting
5.2.1
Connection assembly
Use a cable consisting of shielded twisted pair data lines with suitable characteristics
for the particular operating conditions.
Select a cable diameter that matches the cable bushing of the connector. Make sure that
the cable gland of the mounted connector has a tight fit and that the seals are present
and undamaged. Tighten the threaded connection and check that the seal is correctly
seated, in order to ensure the ingress protection.
Make sure that no moisture enters at the cable end.
5.2.2

Pin assignment

Circular connector M12 x 1 (5-pin)
34
CAUTION!
If the model GDHT-20 is delivered with an adapter or measuring chamber,
it is completely mounted and tested for leak tightness ex-works. Dismoun-
ting compromises the leak tightness of the measuring assembly and
renders it unserviceable!
WARNING!
The instrument shield does not act as a protective conductor for protection
of personnel, rather as a functional ground in order to shield the instru-
ment from electromagnetic fields.
1
-
-
2
U
Supply voltage
+
B
3
U
Ground
-
B
4
A
Signal RS-485
5
B
Signal RS-485
WIKA operating instructions transmitter, models GDT-20 and GDHT-20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gdht-20

Tabla de contenido