Use And Maintenance; Gas Valve; Gas Conversion - Sime RMG Mk.II Serie Instrucciones Para El Instalador

Ocultar thumbs Ver también para RMG Mk.II Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
4

USE AND MAINTENANCE

4. 1

GAS VALVE

"RMG Mk.II" boilers come equipped
standard with a HONEYWELL VR
4605 C gas valve
(for "70 - 80"
models) and VR 4605 CB gas valve
(for "90 - 100" models).
When the boiler is ignited the first
time, it is always recommended to
bleed the piping by using the pressu-
re outlet upstream from the valve
(fig. 10).
4.2
GAS VALVE ADJUSTMENT
The "RMG Mk.II" boilers have the gas
valve equipped with a coil assembly,
which enables, via the double-contact
regulating thermostat, a reduction in
output corresponding to approx. 60%
of nominal output before the burner
goes out completely. Calibration of the
operating pressures is done by SIME in
the factory. Consequently they should
not be altered. Only when you switch to
another type of gas (butane or propa-
ne) is it permitted to alter the opera-
ting pressures (Table 1).
It is essential that this operation be
carried out exclusively by authorized
technical staff. When the working
pressures have been adjusted, reseal
the regulators.
When the gas pressures are to be
reset, this must be done following a set
order: first the maximum pressure and
then the minimum.
4.2. 1 Nominal pressure
adjustment
To set the maximum pressure, pro-
ceed as follows (fig. 11):
– connect the pressure column or a
pressure gauge to the pressure
int ake locat ed on t he bur ner
TABLE 1
Methane - G20
Burner max. pressure
mbar
Burner min. pressure
mbar
Butane - G30
Burner max. pressure
mbar
Burner min. pressure
mbar
Propane - G31
Burner max. pressure
mbar
Burner min. pressure
mbar
manifold;
– unscrew the screw (4) completely;
– set the knob of the thermostat to
the maximum value;
– supply electric power to the boiler;
– loosen the locknut (1) and turn the
connection (3):
to reduce the pressure, turn the
connection counterclockwise; to
increase the pressure, turn the con-
nection clockwise;
– tighten the locknut (1);
– operate the main switch a number
of times, making sure that the maxi-
mum pressure corresponds to the
values given in Table 1.
LEYENDA
1 Locknut M13
2 Coil
3 Max. press. adjust. connection
4 Min. pressure adjust. screw
KEY
1 EV1 coil
2 Pressure regulator
3 Coil assembly
4 EV2 coil
5 LPG adaptor
6 Plastic cap
7 Pressure inlet upstream
8 Pressure inlet
downstream
70 Mk.II
80 Mk.II
9.3
9. 1
4.5
4.6
25.2
25.4
12.2
12.3
32.6
30.2
16.4
16. 1
4.2.2 Reduced pressure
adjustment
To set the reduced pressure, proceed
as follows (fig. 11):
– deactivate the coil (2) electric supply;
– switch on the boiler and af ter a
short period of operation at nominal
output, turn the thermostat knob
slowly towards the minimum posi-
tion until you hear the click of the
first contact of the thermostat;
– leave the knob in that position and,
turning the screw (4), seek the mini-
mum pressure value according to
Table 1 for the gas in question: to
r educe t he pr essur e, tur n t he
screw counterclockwise; to increase
t he pr essur e, tur n t he scr ew
clockwise;
– restore electric power to the coil;
– operate the main switch a number
of times, making sure that the mini-
mum pressure corresponds to the
value given in Table 1.
4.3

GAS CONVERSION

To convert to butane gas (G30) or pro-
pane gas (G31), the main nozzles must
be replaced with another supplied in
Fig. 11
the boiler gas conversion kit and apply
Fig. 10
90 Mk.II
100 Mk.II
9.3
9.3
4.7
4.7
25. 1
25. 1
12.0
12.5
30.0
32.7
15.6
16.6
53

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rmg 70 mk.iiRmg 80 mk.iiRmg 90 mk.iiRmg 100 mk.ii

Tabla de contenido