Descargar Imprimir esta página

Cabling The Solution - Dell PowerVault NX1950 Guia De Instalacion

Ocultar thumbs Ver también para PowerVault NX1950:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 222
You do not need to install the operating system as it is pre-installed.
However, you need to perform the final steps to complete the installation
and configuration of the solution. For more information, see "Completing
the Configuration."

Cabling the Solution

Before you turn on the system, ensure that the PowerVault MD3000
storage array is cabled to the PowerVault NX1950 storage system(s).
Figure 1-1 and Figure 1-2 illustrate how to cable the SAS 5/E HBA
controllers in the PowerVault NX1950 storage system to the PowerVault
MD3000 storage array. The PowerVault NX1950 storage solution supports
single-node and two-node cluster configurations only. See Figure 1-1
for single-node configuration and Figure 1-2 for two-node configuration.
Figure 1-1. Single-Node Configuration
PowerVault NX1950 storage system
6
PowerVault MD3000 storage array
1
NIC port A to Gb Ethernet switch
for data/management (optional)
2
NIC port B to Gb Ethernet switch for
data/management/backup (optional)
3
Gb1 and Gb2 to Gigabit Ethernet
switch(es) for data (static IP address
required for Gb1, optional for Gb2)
8
Installation Guide
All manuals and user guides at all-guides.com
1 2
5
4
4
Port 0 on SAS HBA
to In-0 on controller 1
5
Port 1 on SAS HBA
to In-0 on controller 0
6
DRAC port to Ethernet
switch for lights-out
management (optional)
3

Publicidad

loading