Operation
10
Operation
Personnel:
Protective equipment:
Configuration of the pump
The EcoAdd must be configured before operation and this process is described
Ä Chapter 8.8 'Configuration' on page 89 .
in:
10.1
Switching the pump on and off
WARNING!
The EcoAdd should not be controlled by switching the power supply on/
off.
Each time the pump is switched on, its electronics require approx. 500 msec.
to start up. If the power supply is interrupted during the start-up process, this
may lead to a malfunction. Please use the dosing release to control the pump
(see
1.
The pump is switched on using the 'ON/OFF button'
2.
After switching on, the pump is ready for operation.
ð At start-up, the pump shows the info screen with the display of the determined
technical data for the connected components.
3.
Pressing the 'Start button' on the display
4.
Pressing the 'Pause button' on the display
ð The 'operating screen' stops and the pump goes into standby.
5.
The pump can be switched off again by pressing the 'ON/OFF button'
ð The 'Operating screen' goes dark and the pump is switched off.
MAN046939 Rev. 6-10.2021
n
Operator
n
Specialist
Chemical-resistant protective gloves
n
n
Protective eyewear
n
Safety shoes
Ä Chapter 8.8.7 'Dosing release' on page 99 ).
1
1
ON/OFF button
All entries / settings are made via the "touch-sensitive screen".
(item 1).
starts the pump.
stops the pump.
142
(item 1).