Maintenance Table - Ecolab EcoAdd Instrucciones De Servicio

Ocultar thumbs Ver también para EcoAdd:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 838
12.2

Maintenance table

Interval
24 hours after commissioning or
metering head maintenance
Daily
Half-yearly
When requested on the display
Maintenance work
Check the metering head screws
The tightening torques of the metering head screws are shown on
the pump heads using adhesive labels. They are also specified in
Ä Further information on page 189 .
the chapter
Visual inspection to check leak-tightness of connection parts.
Visual inspection of metering lines
Check the suction and pressure tubes for leakage-free connection
Check suction and pressure valve for contamination and tightness.
Check that the discharge connection on the pump head (diaphragm
rupture)
Check the correct metered quantity
Check the metering head screws
The tightening torques of the metering head screws are shown on
the pump heads using adhesive labels. They are also specified in
Ä Further information on page 189 .
the chapter
Perform the prescribed maintenance on the pump due to a material
dependency between the pump and the chemicals used.
This is the case when a dosing chemical has been selected from a
database imported into the pump (
integrated database' on page 106 ).
165
Maintenance
Ä 'Chemical selection from an
MAN046939 Rev. 6-10.2021
Personnel
Mechanic
Mechanic
Operator
Mechanic
Operator
Mechanic
Operator
Mechanic
Operator
Operator
Operator
Mechanic

Publicidad

Tabla de contenido
loading

Tabla de contenido