IMPORTANT Use the identification names
on the identification label of the product.
IMPORTANT Use these means of
identification whenever you contact
an authorized service workshop.
• IMPORTANT The example of the
Declaration of Conformity is provided
on the last pages of the manual.
3.4 MAIN COMPONENTS
The machine is made up of the
following main components (fig. 1 ) :
A. Handle
B. Starter lever
C. Starter lever release
D. Chute adjustment handle
E. Led lights
F.
Handle pivot closure
G. Central handle
H. Ignition key
I.
Exhaust chute
J.
Deflector
K. Auger
L. Auger compartment
M. Wheel
N. Lower blade
O. Transport handle
Lower part of handle
P.
Q. Cable gland
R. Battery compartment
S. Battery charger (supplied separately)
T.
Battery (supplied separately)
4. ASSEMBLY
For storage and transport purposes, some
components of the machine are not installed
in the factory and have to be assembled after
unpacking. Follow the instructions below.
4.1 ASSEMBLY COMPONENTS
The packaging holds the components needed
for assembly (fig. 4 ) listed in the following table:
Component
Snow thrower
Discharge chute
adjustment handle
Handle
Handle fitting
Fig.
N.
4
1
4.A, 4.A1,
1
4.A2
4.B
1
4.C
1
EN - 7
Component
Spacers and screws for
securing the handle in place
Spacers and screws for
securing the handle in place
Ignition key
Cable gland to handle
Deflector
Instructions
4.2 UNPACKING
1. Cautiously open the packaging, paying
attention not to lose components.
2. Consult the documentation in the box,
including these instructions.
3. Remove all the unassembled parts from the
box.
4. Lift the snow thrower from the box.
5. Dispose of the box and packaging in
compliance with local regulations.
4.3 HANDLE ASSEMBLY
1. Assemble the central part of the handle
(fig. 4.C) on the snow thrower (lower part of
handle), fastening it with screws (fig. 4.D, 4.E)
on both sides.
2. Position the upper handle (fig. 4.B) on the
central one and fasten it with the specific
screws and fastenings (fig. 4.G, 4.F).
3. Fasten the electrical cable in place with the
specific cable gland (fig. 4.I).
4.4 DISCHARGE CHUTE ADJUSTMENT
HANDLE ASSEMBLY
1. Assemble the handle (fig. 5.A1) using the
specific extension shaft (fig. 5.A), fastening
it in place with the 2 screws (fig. 5.A2).Make
sure the holes of the shaft (fig. 5.A) and joint
(fig. 5.A1) are aligned.
2. Insert the 2 screws in the holes and fix.
3. Pass the handle obtained in the specific lower
handle support (fig. 5.B).
4. Insert the end of the handle in the specific
coupling hole on the chute, keeping it straight
and with the grip upwards (fig. 5.C).
5. Check the discharge chute by turning it
entirely in both directions. The chute must
freely rotate (fig. 9 ) .
4.5 DEFLECTOR ASSEMBLY
1. Insert the deflector on the discharge duct in
the upright position (fig. 6.A).
2. Fit the tabs on both sides in the rotation
eyelets (fig. 6.B).
Fig.
N.
4.D, 4.E
2
4.F, 4.G
4
4.H
1
4.I
1
4.J
1
-
1