Scope Of Delivery - SMA NR-SMC50MOD-AST Instrucciones Para La Sustitución

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
SMA Solar Technology AG
Damage to the inverter due to electrostatic discharge
Touching electronic components can cause damage to or destroy the inverter through
electrostatic discharge.
• Ground yourself before touching any component.
Grounding conductor test prior to recommissioning
Prior to recommissioning SMA inverters after the installation of SMA components or power
assemblies which cannot be replaced intuitively, ensure that the grounding conductor in the
inverter is correctly connected. The function of the grounding conductor must be ensured and
all locally applicable laws, standards and directives must be observed.
Observe superordinate standards
The repair work on devices and the consideration and application of other standards which
correspond to a superordinate standard is the responsibility of the qualified person performing
the work. Unauthorized alterations will void guarantee and warranty claims and in most cases
terminate the operating license. SMA Solar Technology AG shall not be held liable for any
damage caused by such changes.
3

Scope of Delivery

Check the scope of delivery for completeness and any externally visible damage. Contact the
Service if the delivery is incomplete or damaged.
Quantity
1
1
1
Replacement Manual
NOTICE
Designation
Power assembly (AST)
8 screws with a microencapsulated pre-coating
(M4x15)
Replacement Manual
AST-SMC46-60A-70HV-RM-xx-10
3 Scope of Delivery
11

Publicidad

Tabla de contenido
loading

Tabla de contenido