Operation Procedure; Tool Operation (Ref. Fig. 1, 4, 5, 6); Emptying The Mandrel Collector (Ref. Fig. 1) - Stanley ProSet XT3 Manual De Instrucciones

Herramienta hidroneumática
Ocultar thumbs Ver también para ProSet XT3:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

E N G L I S H

4. OPERATION PROCEDURE

4.1 TOOL OPERATION (Ref. fig. 1, 4, 5, 6)

Installing a blind rivet
Ensure that the mandrel collector (3) is fitted.
Insert rivet mandrel into the nose piece (1a, b, c or d). The vacuum system will retain the rivet in the nose
piece.
Position the tool.
Ensure nose equipment is at right angle (90°) to the work piece.
Pull and hold trigger (6) until the rivet is fully set in the application.
When the rivet has been set completely, release the trigger (6). The tool will return to its initial position
automatically. The mandrel is automatically dropped into the mandrel collector (3) by the vacuum system.
Mandrel collector must be emptied before it is half full.
CAUTION –DO NOT FORCE THE INSERTION OF A RIVET MANDREL OR RIVET BODY. THIS WILL CAUSE
DAMAGE TO THE TOOL AND/OR APPLICATION.

4.2 EMPTYING THE MANDREL COLLECTOR (Ref. fig. 1)

CAUTION - DO NOT USE THE TOOL WHEN THE MANDREL COLLECTOR IS REMOVED
The tool is fitted with a quick connect/release mandrel collector (3).
A 60° rotation removes or replaces the mandrel collector.
Removing the mandrel collector (3) from the tool automatically turns OFF the vacuum rivet retention and
mandrel extraction system.
Refitting the mandrel collector turns the vacuum system ON.
12

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Proset xt47600376004

Tabla de contenido