Descargar Imprimir esta página

nVent RAYCHEM SC-JBS-L-A Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

9
• Remove box nut.
O-ring
11
Optional: Knock
out drain hole
if installed on
bottom of pipe.
13
• Pair up cable A wires with corresponding cable B wires.
3SC heating cable shown.
4 | nVent.com
• Slide strain relief
over heating cable,
down onto box nut.
• Secure strain
relief by tightening
screws.
Power and ground wires
3/4 in.
(20 mm)
10
12
• Slip the green/yellow
tube onto the braid.
• Trim the braid and tube
as required.
• Repeat for second heating
cable.
3SC heating cable shown.
A3
A1
B1
A2 B2
Heating cable A
• Place junction box onto
stand. Align key-ways in
box hole with alignment
feature on stand.
• Put box nut back onto
stand.
• Tighten box nut with
spanner.
3/4 in.
(20 mm)
B3
B4
A4
Heating cable B

Publicidad

loading