IMPORTANT: To ensure proper electrical insulation, use the specified high temperature Teflon tape provided with the
kit. Do not use common vinyl tape which does not have adequate temperature rating.
1st tape strip
2
2
1
• Wrap entire length of first
tape strip around end of
splice to create a tube
that extends over the end.
Pinch end of tube.
18
• Finished view of installed connections.
• Stow conductors as shown. Ensure a mimimum
clearance of 5/8-inch (16 mm) between each termination.
5/8 in (16 mm) minimum
6 | nVent.com
Remove and
discard release
liners while
wrapping the
tape strips.
• Wrap the second tape
• Fold over pinched
end of tape strip
as shown.
2nd tape strip
1
2
• Wrap remaining two tape strips with a
strip across the end of
the splice to cover the
pinched section, then
continue wrapping it
Repeat these steps for each additional
around the splice.
splice and ground connection.
19
• Install lid.
• Apply insulation and cladding.
• Weather-seal stand entry.
• Install electric heat-tracing labels on insulation cladding.
• Leave these installation instructions with the end user for
future reference.
3rd & 4th tape strips
50% overlap.
3/8 in
(10 mm)
minimum
minimum 50% overlap to completely
cover the metal splice, bare conductors
and a minimum 3/8-inch (10 mm) of the
insulation.