Operation; Configuring The Machine, Entering Welding Parameters - HURNER WeldControl 2.0 1200 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 99
H Ü R N E R S c h w e i s s t e c h n i k G m b H
Nieder-Ohmener Str. 26
35325 Mücke, Germany
4

Operation

To operate the welding system, be sure that it is set on a
proper, level surface and that power supply protection is 32 A
(slow blow).
Important
Before the control unit is turned on, check the oil level of the
hydraulic and control unit and top up with HF-E 15 hydraulic
oil as needed.
Important
The surfaces of the heating element have to be free of grease
and clean, or they have to be cleaned.
Important
Make sure all connectors are tight in their sockets and note
that operation on a worksite is only acceptable if the power
supply has earth-leakage circuit breakers.
Important
After connecting the power supply cord to the mains power supply or
a generator, turn the machine on at the On/Off switch.
It has to be ensured that the voltage of the power source the
machine is connected to corresponds to the rated voltage of
the machine. Also the following has to be respected when
using extension cables:
Caution
For 400 V power: wire section 4.0 mm² = max. 75 m long
4.1 Configuring the Machine, Entering Welding Parameters
After the machine was switched on, Display 1 shows on the screen.
The machine will then automatically start the auto-test process to
check the sensors and the system clock and to determine the number
of free welding reports. This test can be bypassed by holding down
the STOP/RESET key when Display 1 is showing.
If during the auto-test an error is detected, a "System Error"
message shows on the display. When this happens, the weld-
ing unit has to be disconnected immediately from the power
suppy and heating element/facing tool, and it has to be re-
Caution
turned to the manufacturer for repair.
Subsequent to a successful auto-test or after the test was bypassed, the
machine first shows overview screens on the selected kind of machine
and welding standard, then Display 3.
Display 3 shows the the data of the next welding, including time of
day, date, report number, and joint number, along with, in the second-
to-last line, the actual input voltage and — if the cable of the heating
element for butt welding is connected — the actual and nominal heat-
ing element temperature before and after the slash.
From Display 3, it is possible to access the Configuration Menu in which
the default behavior of the welding machine can be configured. To
access it, press the MENU key and then, on the following enter code
screen, type the access code using the cursor keys or hold the tran-
sponder card in front of the RFID reader.
Pressing the ñ and ò cursor keys in the menu that appears (Display 4),
Version July 2020
wire section 10.0 mm² = max. 100 m long
HÜRNER WeldControl 2.0 1200 User's Manual
32 A
********************
*
HUERNER
*
WeldControl 2.0 *
********************
Welding Standard
DVS
Next welding
15:44:52
402V
112V
135C/220C
Rep. No. 00072/00002
CODE : 415311
*
Display 1
Display 2
29.05.12
Display 3
11
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido