TM 514 – COMMON RAIL TEST
Produzido por Tecnomotor Eletrônica do Brasil S/A - REPRODUÇÃO PROIBIDA - Eventuais erros ou defeitos favor comunicar tecnomotor@tecnomotor.com.br
Supplying the equipment for the first time
Check that the drain valves (1) are closed before starting the supply.
To fill the TM 514, remove the tank nozzle cap (2) and insert 5.5 liters of ISO
4113 calibration fluid. Check the maximum level through the maximum tank level
display (3).
Check tightness of fluid filter (4).
After supply, access in the CommonRail PC Fast program the "Remote
Configuration" function in the "Configuration" menu.
184